Skip to content
Frontier Desk

Colocation, a powered shell or a GPU cloud: which fits a mid-size firm putting an inference cluster into production?

Quick answer, Nov 22, 2026As of 22 November 2026, rent from a GPU cloud while inference demand is still moving or nobody on staff runs hardware. Move to colocation once a steady load justifies owning the servers; the provider supplies space, power and cooling for one to five years. A powered shell fits only a firm that will build its own data hall.

A firm that puts AI inference into production has to decide where the GPUs live. Each option hands a different part of the stack to someone else: the platform, the servers, the power and cooling, or only the building. That split decides how long you commit, who pays for power and what an outage gets you. The terms below were read on 22 November 2026 from the 2025 annual reports of Digital Realty, Equinix and Fermi, and from CoreWeave's 10-Q for the quarter ended 30 September 2026. The filings describe structure, not rates, so no prices appear here.

Four places to run the cluster

OptionWhat you own and runCommitment in the filingsPower and outagesSource
GPU cloudNothing physical. Customers buy access "through either committed contracts or on an on-demand basis"On-demand customers "do not commit to a specific contractual period"; committed contracts are take-or-pay"most of our customer agreements and terms of service contain service level commitments", with "service credits or refunds" if missedCoreWeave 10-Q, Item 2, "Components of Results of Operations: Revenue"; Part II, Item 1A, "We have a limited history selling access to our platform…"; Part II, Item 1A, "If we are unable to attract new customers…"; Part II, Item 1A, "Our platform is complex…"
Retail colocation (under 1 MW)Your servers in cabinets or a cage; "Small (one cabinet) to medium (75 cabinets) deployments""Contract length generally 2-5 years"; most Equinix contracts run "one to five years, and thereafter, automatically renew in one-year increments"Equinix bills "based on the space and power a customer consumes"; across its whole portfolio, Digital Realty passes "the vast majority" of utilities expense "directly through to our customers"Digital Realty 10-K, Item 1, "Data Center Solution Types"; Equinix 10-K, Note 2, "Remaining Performance Obligations"; Equinix 10-K, Item 1, "Infrastructure Offerings"; Digital Realty 10-K, Item 1A, "Many of our costs…"
A larger suite (over 1 MW)Your servers in a "Customized data center environment for specific deployment needs""Contract length generally 5-10+ years""Substantially all" Digital Realty agreements carry service level commitments, backed by "service level credits against customer rent payments"Digital Realty 10-K, Item 1, "Data Center Solution Types"; Item 1A, "Any failure of our physical or information technology…"
Powered shellThe data center itself: Digital Realty's shell product provides "the physical location, requisite power and network access", for customers who build and operate the restTerm: UNKNOWN in the filings read. Fermi expects shell leases on "a triple-net or similar basis"; for comparison, CoreWeave's own data center leases as a tenant run "from three to sixteen years"Fermi expects shell leases "structured around contracted power capacity (megawatts) and service levels"Digital Realty 10-K, Item 1, "Our Product Offerings: Capacity"; CoreWeave 10-Q, Note 8, "Leases"; Fermi 10-K, Item 1, "Our Business Model"

Digital Realty draws the line between the last rows in its own words. Colocation suits customers "who may lack the bandwidth, capital budget, expertise or desire to provide their own extensive data center infrastructure", while its Powered Base Building® product is "For customers who possess the ability to build and operate their own infrastructure" (10-K, Item 1, "Our Product Offerings: Capacity"). Fermi, a development-stage company that had not yet earned revenue, describes shells with "cooling systems designed to support tenant mechanical, electrical, and plumbing ("MEP") installation" and aims its campus at "large, long-duration hyperscale deployments" (Fermi 10-K, Item 1, "Overview" and "Development Strategy and Plan of Operations").

Which one fits your situation

This is Frontier Desk's reading of the filings above, set against what a mid-size firm usually has.

  • Demand is still moving, or nobody on staff runs hardware. Use a GPU cloud. The provider owns, powers and repairs the servers. Whether to rent on demand, reserve a block or commit for a term is covered in buy GPUs, reserve capacity or rent on demand.
  • A steady inference load that fits in a few cabinets or a cage. Retail colocation. You buy or lease the servers and pay for space and power over the contract terms in the table. Ask early whether the hall can power GPU racks: Equinix warns that in older sites "the current demand for power may exceed the designed electrical capacity" and that "power, not space, is a limiting factor" (10-K, Item 1A, "The use of high-power density equipment…"). Get the power per cabinet in writing.
  • Signed customer demand above about 1 MW for five years or more. A larger suite, on the longer terms in the table. Match the lease term to the customer contracts behind it.
  • A powered shell. This fits only if you plan to build and run a data hall yourself. At that point the shell is a data center project, and project finance or corporate debt for a data center build is the next read.

Terms to settle before you sign a colocation contract

Where Frontier Desk fits

In the Cybernetic Age a services or software firm can end up running compute as part of what it sells, under customer contracts that pay for it. Colocation and a shell both mean owning or leasing the GPUs, and a lender reads the site as part of the project: /compute asks for "a colocation quote from a Tier III data center" alongside the hardware quote. Frontier Desk is an advisor. It helps firms match the facility term and the hardware financing to the contracts they hold. For the financing itself, read a GPU loan, a lease or vendor financing and how lenders underwrite a GPU cluster loan, or start with a free first look.

Questions

Is colocation cheaper than a GPU cloud for inference? There is no public answer: UNKNOWN. On-demand cloud rates are published; colocation, power and hardware are quoted privately, and the answer turns on how busy the servers stay. Buy GPUs or rent them sets out what is published.

Can I start in a GPU cloud and move to colocation later? Yes, if your cloud commitment ends before the colocation contract starts. Any committed cloud term keeps running after you move, so line up the two dates.

Does a powered shell ever suit a firm under 1 MW? The filings point the other way. Digital Realty offers it to customers able "to build and operate their own infrastructure", and CoreWeave, which leases data centers as a tenant, reports that certain of those leases carry "contractual obligations to procure and install equipment at the leased premises" (10-Q, Note 8, "Leases").

All guides